Railway Bridge

About This Project

Installed a H-pile foundation, and installed and removed sheet pile retaining walls for the bridge contractor.

Location:
Windermere BC

Johnston Construction installed sheet pile retaining walls and H-pile foundations for a new rail bridge on CP Rail’s track near Windermere, BC for the General Contractor.  The piles were installed quickly and efficiently by maximizing the productivity during work windows.  Despite a large increase in the expected pile required for the project the work was completed on schedule allowing the General Contractor to move onto the next phase of work in a timely manner.





Principal Client:
Formula Contractors BC Ltd.