About This Project
Location at 65 km on the Flathead River FSR in the Rocky Mountain Resource District. Installation of a 30 metre temporary bridge supplied by the Ministry. Installation of a 36.57 metre steel girder bridge with composite concrete deck on driven steel H pile. On the completion of the installation of the permanent bridge and all approaches, need to de-activate the temporary bridge. Also included placement of Rip Rap and HSS railings.
Location:
Flathead Valley
Value:
Approximately $300,000.00
Principal Client:
Ministry of Lands, Forests, and Natural Resources
Contact Name:
Hans Beurskens
Environmental:
Lotic Environmental